Parkside North by Brigade

Off BEL Circle, Bangalore - Ongoing

RERA STATUS:

PRM/KA/RERA/1251/309/PR/181122/002152 available at https://rera.karnataka.gov.in/

Overview

Parkside North at Jalahalli - Where different walks of life meet the like-minded.

Welcome to a place that connects your higher thoughts to life’s simpler pleasures. From earthy, fluid designs to 25+ contemporary amenities (that include a luxurious clubhouse, multiple sports facilities, swimming pool, 300m long lively central streets & more), everything here lets you enjoy the rarest of everyday experiences.

Media

Other downloads

Master plans / Floor plans

Masterplan

Download

Floorplans

Download

Application Form

Allotment Form

Download

3D Virtual Tour

Walkthrough Video

Status Gallery

Oct 2020 - Tower F: Structure, blockwork, MS works completed; Internal plastering work completed
Oct 2020 - Tower F: Structure, blockwork, MS works completed; Internal plastering work completed
Oct 2020 - Towers K, L, M, and N: External plastering work-in-progress
Oct 2020 - Towers K, L, M, and N: External plastering work-in-progress
Oct 2020 - Tower F: Structure, blockwork, MS works completed; External plastering work-in-progress
Oct 2020 - Tower F: Structure, blockwork, MS works completed; External plastering work-in-progress
Oct 2020 - Towers I, J, O, and P: 4th floor plastering, north side external plastering work-in-progress
Oct 2020 - Towers I, J, O, and P: 4th floor plastering, north side external plastering work-in-progress
Oct 2020 - Towers G, H, Q, and R: Above Terrace work and blockwork completed; 3rd floor plastering work-in-progress
Oct 2020 - Towers G, H, Q, and R: Above Terrace work and blockwork completed; 3rd floor plastering work-in-progress
Oct 2020 - Towers E, F, S, and T: 2nd floor slab work-in-progress
Oct 2020 - Towers E, F, S, and T: 2nd floor slab work-in-progress
Oct 2020 - Towers C & V: 2nd floor slab completed; Towers D and U: 2nd floor slab work-in-progress
Oct 2020 - Towers C & V: 2nd floor slab completed; Towers D and U: 2nd floor slab work-in-progress
Oct 2020 - Towers A and X: 4th floor slab completed; Towers B and W: 3rd floor slab work-in-progress
Oct 2020 - Towers A and X: 4th floor slab completed; Towers B and W: 3rd floor slab work-in-progress
Oct 2020 - Towers U and V: Plastering work-in-progress
Oct 2020 - Towers U and V: Plastering work-in-progress
Oct 2020 - Towers I, J, O, and P: Lift erection work-in-progress
Oct 2020 - Towers I, J, O, and P: Lift erection work-in-progress
Oct 2020 - Towers K, L, M, N, I, J, O, and P: Basement finishing work-in-progress
Oct 2020 - Towers K, L, M, N, I, J, O, and P: Basement finishing work-in-progress
Oct 2020 - South side UG sump and ramp work under progress
Oct 2020 - South side UG sump and ramp work under progress
Oct 2020 - Southside retaining wall work-in-progress
Oct 2020 - Southside retaining wall work-in-progress
Oct 2020 - South side MS fencing work completed
Oct 2020 - South side MS fencing work completed
1/14

Get In Touch

RERA STATUS:

PRM/KA/RERA/1251/309/PR/181122/002152 available at https://rera.karnataka.gov.in/

PRICE:

1 BHK: 44 Lakh Onwards
2 BHK: 71 Lakh Onwards

Offer:
Payment Holiday till September 2021*

*Valid until Offer of Possession or October 2021, whichever is earlier.

TYPE:

1 and 2 bedroom apartments

SUPER BUILT-UP AREA:

1 Bedroom: 65 Sq.m - 66 Sq.m
2 Bedroom: 104 Sq.m - 118 Sq.m

CARPET AREA:

1 Bedroom: 39 Sq.m
2 Bedroom: 59 Sq.m

MORE DETAILS:

Total Area: 5 Acre
Floors: 4

Note: (1 Sq.m = 10.764 Sq.ft)

Features

300-metre long Central Street, 6 Urban Corridors with Plazas, 60% Open Space, laden with greenery, Urban Elevation Design, Congregation Areas, Cafe & more, Grand Entrance Plaza & Lobby, Double Height Multipurpose Hall, Fully equipped AV Room, Table tennis & Indoor games, Triple Height Badminton court, Swimming pool with lounge deck, Multipurpose play court, Indoor & Outdoor Gymnasium, Garden & Amphitheatre, Children's play area, Yoga & Jogging Track, Guest Rooms, Provision for clinic, super market & pharmacy
ADDRESS:

Parkside North by Brigade
Jalahalli, Off BEL Circle,
North Bangalore

Social Infrastructure Nearby

Gangamma Circle 3 Kms (7 Min)
BEL Circle 4.5 Kms (10 Min)
Jalahalli Metro Station 4.3 Kms (12 Min)
Orion Mall 10 Kms (18 Min)
Manyata Business Park 12 Kms (18 Min)
Garuda Mall 9 Kms (20 min)