Enquire Now
Enquire Now!
I agree to the Terms & Conditions

Parkside North by Brigade

Off BEL Circle, Bangalore - Ongoing

RERA STATUS:

PRM/KA/RERA/1251/309/PR/181122/002152 available at https://rera.karnataka.gov.in/

Overview

Parkside North at Jalahalli - Where different walks of life meet the like-minded.

Welcome to a place that connects your higher thoughts to life’s simpler pleasures. From earthy, fluid designs to 25+ contemporary amenities (that include a luxurious clubhouse, multiple sports facilities, swimming pool, 300m long lively central streets & more), everything here lets you enjoy the rarest of everyday experiences.

Media

Other downloads

Master plans / Floor plans

Masterplan

Download

Floorplans

Download

Application Form

Allotment Form

Download

3D Virtual Tour

Walkthrough Video

Status Gallery

Jan 2022 - Parkside North Block E (Tower O, P, J & I): On commencement of Painting
Jan 2022 - Parkside North Block E (Tower O, P, J & I): On commencement of Painting
Jan 2022 - Parkside North Block D (Tower Q, R, H & G): On commencement of Painting
Jan 2022 - Parkside North Block D (Tower Q, R, H & G): On commencement of Painting
Jan 2022 - Parkside North Block A (Tower W, X, B & A): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block A (Tower W, X, B & A): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block A (Tower W, X, B & A): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block A (Tower W, X, B & A): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block B (Tower U, V, D & C): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block B (Tower U, V, D & C): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block C (Tower S, T, F & E): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block C (Tower S, T, F & E): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block C (Tower S, T, F & E): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block C (Tower S, T, F & E): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block A: (Tower W, X, B & A): On commencement of Painting
Jan 2022 - Parkside North Block A: (Tower W, X, B & A): On commencement of Painting
Jan 2022 - Parkside North Block B (Tower U, V, D & C): On commencement of Painting
Jan 2022 - Parkside North Block B (Tower U, V, D & C): On commencement of Painting
Jan 2022 - Parkside North Block B (Tower U, V, D & C): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block B (Tower U, V, D & C): Commencement of fixing of door & windows
Jan 2022 - Parkside North Block C (Tower S,T,F & E): On commencement of Painting
Jan 2022 - Parkside North Block C (Tower S,T,F & E): On commencement of Painting
Dec 2021 - Lower basement painting Work in progress
Dec 2021 - Lower basement painting Work in progress
Dec 2021 - Lower basement painting Work in progress
Dec 2021 - Lower basement painting Work in progress
Dec 2021 - STP Work in progress
Dec 2021 - STP Work in progress
Dec 2021 - Amenities: Reception works Under progress
Dec 2021 - Amenities: Reception works Under progress
Dec 2021 - A Tower: Multipurpose hall Interior works Under progress
Dec 2021 - A Tower: Multipurpose hall Interior works Under progress
Dec 2021 - Tower K L M N: Internal flat Toilet fixture work in progress
Dec 2021 - Tower K L M N: Internal flat Toilet fixture work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower K L M N: Internal flat door, electrical and painting work in progress
Dec 2021 - Tower K L M N: Internal flat door, electrical and painting work in progress
Dec 2021 - Tower K L M N: Internal flat door, electrical and painting work in progress
Dec 2021 - Tower K L M N: Internal flat door, electrical and painting work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower K L M N: Internal flat QA Certification work in progress
Dec 2021 - Tower A B C D: Southside view - Driveway and compound wall work in progress
Dec 2021 - Tower A B C D: Southside view - Driveway and compound wall work in progress
Dec 2021 - Tower G H I J K L: Southside view
Dec 2021 - Tower G H I J K L: Southside view
Dec 2021 - Tower G H Q R: Central street view, Painting and Planting work completed
Dec 2021 - Tower G H Q R: Central street view, Painting and Planting work completed
Dec 2021 - Tower I J O P: External Texture work, Painting, Landscape work Completed
Dec 2021 - Tower I J O P: External Texture work, Painting, Landscape work Completed
Dec 2021 - Tower E F S T: External plastering and Painting work completed, Swimming pool work in progress
Dec 2021 - Tower E F S T: External plastering and Painting work completed, Swimming pool work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower W X U V M N K L: North side/Central street Landscape/hardscape work in progress
Dec 2021 - Tower A B W X: Landscape and sculpture work Completed
Dec 2021 - Tower A B W X: Landscape and sculpture work Completed
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed(Night view)
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed(Night view)
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed
Dec 2021 - Tower A B W X: Tower A W X External Painting work, Entrance ramp work Completed
1/34

Get In Touch

RERA STATUS:

PRM/KA/RERA/1251/309/PR/181122/002152 available at https://rera.karnataka.gov.in/

PRICE:

1 BHK: 44 Lakh Onwards
2 BHK: 71 Lakh Onwards

Offer:

Pay 10% now and rest on intimation of possession*

TYPE:

1 and 2 bedroom apartments

SUPER BUILT-UP AREA:

1 Bedroom: 65 Sq.m - 66 Sq.m
2 Bedroom: 104 Sq.m - 118 Sq.m

CARPET AREA:

1 Bedroom: 39 Sq.m
2 Bedroom: 59 Sq.m

MORE DETAILS:

Total Area: 5 Acre
Floors: 4

Note: (1 Sq.m = 10.764 Sq.ft)

Features

300-metre long Central Street, 6 Urban Corridors with Plazas, 60% Open Space, laden with greenery, Urban Elevation Design, Congregation Areas, Cafe & more, Grand Entrance Plaza & Lobby, Double Height Multipurpose Hall, Fully equipped AV Room, Table tennis & Indoor games, Triple Height Badminton court, Swimming pool with lounge deck, Multipurpose play court, Indoor & Outdoor Gymnasium, Garden & Amphitheatre, Children's play area, Yoga & Jogging Track, Guest Rooms, Provision for clinic, super market & pharmacy
ADDRESS:

Parkside North by Brigade
Jalahalli, Off BEL Circle,
North Bangalore

Social Infrastructure Nearby

Gangamma Circle 3 Kms (7 Min)
BEL Circle 4.5 Kms (10 Min)
Jalahalli Metro Station 4.3 Kms (12 Min)
Orion Mall 10 Kms (18 Min)
Manyata Business Park 12 Kms (18 Min)
Garuda Mall 9 Kms (20 min)

Share

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Click to call Click To Call