Exterior
A Lifestyle of Unparalleled Luxury and Tranquillity Awaits
The second phase of Brigade Atmosphere, Pearl, is a low-rise gated residential enclave consisting of luxurious courtyard villaments. Surrounded by acres of lush greenery, these unique homes nestle you in the luxury you deserve.
The presidential villaments are an amalgamation of exclusive villa features and the luxury of community living. These villaments are set in ground-plus-3-floor structures. Each villament has 3 bedrooms, a dedicated study and multiple terraces to have an independent and peaceful life in the heart of the community. There is a dedicated common area and a lift for every two villaments.
These villaments are designed keeping in mind access to natural light and ventilation, clustered around a central courtyard for the ideal mix of private and communal spaces. The villaments’ Mediterranean-themed warm tone juxtaposes against the green open surroundings to raise the bar on what luxurious living really feels like.
Read moreLand Area
18 Acres
Type
3 Bedroom Luxurious Courtyard
Villaments
Units
128
Super Built-up Area
235.96 - 240.52 Sq.m.
(2540 - 2589 Sq. ft.)
Carpet Area
168.84 Sq.m - 169.96 Sq.m
(1814 - 1830 Sq. ft.)
Amenities
Experience a lifestyle of unparalleled luxury with the exceptional Amenities at Brigade Atmosphere Pearl, Devanahalli. Every Amenity here is a testament to uncompromising quality.
































*Images are for representation purpose.
Gallery




Exterior


Dinning Hall


Veranda View


Exterior


Living Room

Tranquil Lawn

Tranquil Lawn

Tranquil Lawn

Tranquil Lawn
*Images are for representation purpose.
Videos

Master Plan
Embark on a visual journey to your dream space! Fill out the form to access the exclusive apartment unit plan and envision your life in a Brigade Home.
View Unit Plans
Price
3 BHK + 3T
INR 2.08 Crore Onwards*
*Government Charges, Other Charges and Taxes Applicable
*The prices are subject to change.
EMI Calculator
Price
3 BHK + 3T
INR 2.08 Crore Onwards*
*Government Charges, Other Charges and Taxes Applicable
* The prices are subject to change.
Location
Enjoy proximity to city conveniences without sacrificing tranquillity. Our location strikes the perfect balance for an ideal life, just 25 minutes away from the International Airport.

Know Your Neighbourhood
ViewKnow Your Neighbourhood
ViewThe School for Global Minds (Brigade Orchards)
7 km
Chanakya University (Brigade Orchards)
7 km
Eurokids Preschool
5.4 km
Carmel English School
4.5 km
Shantiniketan Public School
5.9 km
The School for Global Minds (Brigade Orchards)
7 km
Chanakya University (Brigade Orchards)
7 km
Eurokids Preschool
5.4 km
Carmel English School
4.5 km
Shantiniketan Public School
5.9 km
Ramaiah Medical Centre (Brigade Orchards)
6.8 km
Shri Shirdi Sai Hospital
4.7 km
Akash Hospital
6.6 km
New Manasa Hospital
3.8 km
Ramaiah Medical Centre (Brigade Orchards)
6.8 km
Shri Shirdi Sai Hospital
4.7 km
Akash Hospital
6.6 km
New Manasa Hospital
3.8 km
The Arcade at Brigade Orchards
6.5 km
KIADB Aerospace SEZ and Hardware Park
16.1 km
The Arcade at Brigade Orchards
6.5 km
KIADB Aerospace SEZ and Hardware Park
16.1 km
Signature Club Resort (Brigade Orchards)
7.4 km
The Arcade at Brigade Orchards
6.5 km
Sports Arena and Stadium (Brigade Orchards)
7.2 km
RFC Football Academy
5.7 km
Golfshire Club
8.9 km
Signature Club Resort (Brigade Orchards)
7.4 km
The Arcade at Brigade Orchards
6.5 km
Sports Arena and Stadium (Brigade Orchards)
7.2 km
RFC Football Academy
5.7 km
Golfshire Club
8.9 km
Project Status
The entire project exudes a rare sense of completeness.

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress - Jun 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jun 2025

WX – External paint and tiling completed. internal Painting, door and window works in Progress. QA Certification started. QAC 13/16 - Jun 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress - Jun 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress - Jun 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress - Jun 2025

I cluster Entrance Area final finishing along with External Development. - Jun 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jun 2025

J&K cluster terrace Area final finishing along with QA snag. - Jun 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress - Jun 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress - Jun 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Jun 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jun 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress - Jun 2025

UV – External paint completed. internal Painting, tiling, door and window works in Progress. QA Certification started 9/16 - Jun 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jun 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Jun 2025

UV – External paint completed. internal Painting, tiling, door and window worksin Progress. QA Certification started 3/16. - May 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress. - May 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress. - May 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress. - May 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress. - May 2025

RST – all Units QA Certification finished. QAC 24/24. External and Common area QA certification in progress. - May 2025

J&K cluster terrace Area final finishing along with QA snag. - May 2025

I cluster Entrance Area final finishing along with External Development. - May 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - May 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - May 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - May 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - May 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - May 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - May 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress. - May 2025

OPQ – all Units QA Certification done, QAC 24/24. External and Common area QA certification in progress. - May 2025

95% of External Development works are completed and remaining in Progress - May 2025

95% of External Development works are completed and remaining in Progress - May 2025

95% of External Development works are completed and remaining in Progress - May 2025

95% of External Development works are completed and remaining in Progress - May 2025

95% of External Development works are completed and remaining in Progress - May 2025

WX – External paint and tiling completed. internal Painting, door and window works in Progress. QA Certification started. QAC 9/16 - May 2025

90% of External Development works are completed and remaining in Progress - Apr 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Apr 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Apr 2025

90% of External Development works are completed and remaining in Progress - Apr 2025

WX – External paint completed. internal Painting, tiling, door and window worksin Progress. QA Certification started. QAC 5/16 - Apr 2025

UV – External paint completed. internal Painting, tiling, door and window worksin Progress. QA Certification started - Apr 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 23/24. - Apr 2025

I cluster Entrance Area final finishing along with External Development - Apr 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 23/24. - Apr 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 23/24. - Apr 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 23/24. - Apr 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-24/24 - Apr 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-24/24 - Apr 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-24/24 - Apr 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-24/24 - Apr 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Apr 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Apr 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Apr 2025

90% of External Development works are completed and remaining in Progress - Apr 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Mar 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-23/24 - Mar 2025

85% of External Development works are completed and remaining in Progress - Mar 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-23/24 - Mar 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 17/24 - Mar 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 17/24 - Mar 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 17/24 - Mar 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Mar 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Mar 2025

WX – External paint completed. internal Painting, tiling, door and window worksin Progress. QA Certification started. - Mar 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 17/24 - Mar 2025
LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Mar 2025

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing completed. - Mar 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-23/24 - Mar 2025

85% of External Development works are completed and remaining in Progress - Mar 2025

UV – External paint completed. internal Painting, tiling, door and window worksin Progress. QA Certification started. - Mar 2025

J&K cluster terrace Area final finishing along with QA snag. - Mar 2025

85% of External Development works are completed and remaining in Progress - Mar 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-18/24 - Feb 2025

80% of External Development works are completed and remaining in Progress - Feb 2025

J&K cluster terrace Area final finishing along with QA snag. - Feb 2025

80% of External Development works are completed and remaining in Progress - Feb 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Feb 2025

80% of External Development works are completed and remaining in Progress - Feb 2025

WX – External paint completed. internal Painting, tiling, door and window works in Progress. - Feb 2025

UV – External paint completed. internal Painting, tiling, door and window works in Progress. - Feb 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 9/24. - Feb 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 9/24. - Feb 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 9/24. - Feb 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Feb 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 9/24. - Feb 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-18/24 - Feb 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-18/24 - Feb 2025

QA certification started in OPQ cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-18/24 - Feb 2025

I cluster Entrance Area final finishing along with External Development. - Feb 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 5/24. - Jan 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jan 2025

I cluster Entrance Area final finishing along with External Development. - Jan 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-13/24 - Jan 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-13/24 - Jan 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-13/24 - Jan 2025

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-13/24 - Jan 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jan 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jan 2025

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Jan 2025

J&K cluster terrace Area final finishing along with QA snag. - Jan 2025

75% of External Development works are completed and remaining in Progress - Jan 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 5/24. - Jan 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 5/24. - Jan 2025

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 5/24. - Jan 2025

75% of External Development works are completed and remaining in Progress - Jan 2025

75% of External Development works are completed and remaining in Progress - Jan 2025

WX – Plastering completed. Painting, tiling, door and window works in Progress. - Jan 2025

UV – Plastering completed. Painting, tiling, door and window works in Progress. - Jan 2025

70% of External Development works are completed and remaining in Progress - Dec 2024

70% of External Development works are completed and remaining in Progress - Dec 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 2/24. - Dec 2024

UV – Plastering completed. Painting, tiling, door and window worksin Progress. - Dec 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-10/24 - Dec 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 2/24. - Dec 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 2/24. - Dec 2024

WX – Plastering completed. Painting, tiling, door and window worksin Progress. - Dec 2024

70% of External Development works are completed and remaining in Progress - Dec 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. QAC 2/24. - Dec 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-10/24 - Dec 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-10/24 - Dec 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-10/24 - Dec 2024

External Development works in Progress - Nov 2024

External Development works in Progress - Nov 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin ProgressQAC-7/24 - Nov 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Nov 2024

LMN – units QA Certification completed 24/24 + common area QA certification in Progress+ Terrace area Finishing completed. - Nov 2024

LMN – units QA Certification completed 24/24 + common area QA certification in Progress+ Terrace area Finishing completed. - Nov 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin ProgressQAC-7/24 - Nov 2024

RST – External Paint+ Internal Paint and Door & Window worksin Progress. Units QA Certification started. QAC 1/24. - Nov 2024

UV – Plastering completed Painting and tiling works in Progress. - Nov 2024

WX – Structure & Masonry work completed plastering and painting and tiling work in Progress. - Nov 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin ProgressQAC-7/24 - Nov 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin ProgressQAC-7/24 - Nov 2024

RST – External Paint+ Internal Paint and Door & Window worksin Progress. Units QA Certification started. QAC 1/24. - Nov 2024

RST – External Paint+ Internal Paint and Door & Window worksin Progress. Units QA Certification started. QAC 1/24. - Nov 2024

RST – External Paint+ Internal Paint and Door & Window worksin Progress. Units QA Certification started. QAC 1/24. - Nov 2024

J&K cluster terrace Area final finishing along with QA snag. - Oct 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. - Oct 2024

I cluster Entrance Area final finishing along with External Development. - Oct 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window works in Progress QAC-23/24 - Oct 2024

External Development works in Progress - Oct 2024

External Development works in Progress - Oct 2024

WX – Structure & Masonry work completed plastering and paint work in Progress. - Oct 2024

UV – Plastering completed Painting and tiling works in Progress. - Oct 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. - Oct 2024

RST – External Paint+ Internal Paint and Door & Window works in Progress. Units QA Certification started. - Oct 2024

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing in Progress. - Sep 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Sep 2024

External Development works in Progress - Sep 2024

External Development works in Progress - Sep 2024

WX – Structure & Masonry work completed plastering work in Progress. - Sep 2024

UV – Structure & block Masonry work completed Plastering works in Progress. - Sep 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty TS cluster + Tiling and Door & Window works in Progress - Sep 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty TS cluster + Tiling and Door & Window works in Progress - Sep 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty TS cluster + Tiling and Door & Window works in Progress - Sep 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-1/24 - Sep 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-1/24 - Sep 2024

QA certification started in O cluster and External Painting + Internal Painting + Door & Window worksin Progress QAC-1/24 - Sep 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, I cluster clear and JK attending final QA snag points. - Sep 2024

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing in Progress. - Sep 2024

LMN – units QA Certification completed 24/24 + common area QA certification in Progress + Terrace area Finishing in Progress. - Sep 2024

I cluster Entrance Area final finishing along with External Development. - Sep 2024

J&K cluster Entrance Area final finishing along with External Development - Aug 2024

Cluster IJK – 24/24 Units Got Certified + Common area Certification in progress, attending final QA snag points. - Aug 2024

LMN – QA Certification in Progress 21/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress. - Aug 2024

LMN – QA Certification in Progress 21/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress. - Aug 2024

LMN – QA Certification in Progress 21/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress. - Aug 2024

WX – Structure works completed + Third Floor Masonry in Progress + 1st floor plastering work in Progress. - Aug 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window worksin Progress - Aug 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window worksin Progress - Aug 2024

UV – Structure works completed, block Masonry work completed + Second Floor Plastering works in Progress - Aug 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty @ FF + Tiling @ 2 nd floor and Door & Window worksin Progress @ GF. - Aug 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window worksin Progress - Aug 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty @ FF + Tiling @ 2 nd floor and Door & Window worksin Progress @ GF. - Aug 2024

External Development works in Progress - Aug 2024

External Development works in Progress - Aug 2024

RST – Structure works completed, External Paint, External Plastering + Internal Putty @ FF + Tiling @ 2 nd floor and Door & Window worksin Progress @ GF. - Aug 2024

External Development works in Progress - Aug 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, attending final QA snag points. - Aug 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, attending final QA snag points. - Aug 2024

IJK – 24/24 Units Got Certified + Common area Certification in progress, attending final QA snag points. - Aug 2024

External Development works in Progress - Jun 2024

External Development works in Progress - Jun 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

External Development works in Progress - Jun 2024

UV – Structure works completed + Third Floor Masonry + Second Floor Plastering works in Progress WX – Structure works completed + Second Floor Masonry in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 3 rd Floor + Door & Window works in Progress - Jun 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

LMN – QA Certification in Progress 16/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

U,V,W,X Cluster – “On casting of Terrace floor slab” – Status as on 22nd - Jun 2024

U,V,W,X Cluster – “On casting of Terrace floor slab” – Status as on 22nd - Jun 2024

External Development works in Progress - Jun 2024

LMN – QA Certification in Progress 16/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

OPQ - Structure works completed, External Painting + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

LMN – QA Certification in Progress 16/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

UV – Structure works completed + Third Floor Masonry + Second Floor Plastering works in Progress WX – Structure works completed + Second Floor Masonry in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 3 rd Floor + Door & Window works in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 3 rd Floor + Door & Window works in Progress - Jun 2024

External Development works in Progress - Jun 2024

External Development works in Progress - Jun 2024

External Development works in Progress - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

External Development works in Progress - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting Completed - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting Completed - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting Completed - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting Completed - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

IJK Show Flat Interior works completed - Jun 2024

LMN – QA Certification in Progress 16/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 2 nd Floor + Door & Window works in Progress - June 2024

UV – Structure works completed + Third Floor Masonry + Second Floor Plastering works in Progress - Jun 2024

External Development works in Progress - Jun 2024

OPQ - Structure works completed, External Plastering + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

LMN – QA Certification in Progress 08/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

LMN – QA Certification in Progress 08/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

External Development works in Progress - Jun 2024

External Development works in Progress - Jun 2024

External Development works in Progress - Jun 2024

UV – Structure works completed + Third Floor Masonry + Second Floor Plastering works in Progress - Jun 2024

OPQ - Structure works completed, External Plastering + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

WX – Third Floor Structure works + Second Floor Masonry in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 2 nd Floor + Door & Window works in Progress - Jun 2024

RST – Structure works completed, External Plastering + Internal Putty @ FF + Tiling @ 2 nd Floor + Door & Window works in Progress - Jun 2024

OPQ - Structure works completed, External Plastering + Internal Tiling & Painting + Door & Window works in Progress - Jun 2024

LMN – QA Certification in Progress 08/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

LMN – QA Certification in Progress 08/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting in Progress - June 2024

U,V,W,X Cluster – Milestone Release – On Commencement of fixing of Doors & Windows - Jun 2024

IJK – 24/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting in Progress - June 2024

U,V,W,X Cluster – Milestone Release – On Commencement of fixing of Doors & Windows - Jun 2024

UVWX cluster – Milestone Release On commencement of Flooring - May 2024

External Development works in Progress - Apr 2024

IJK – 20/24 Units Got Certified + Common area Certification in Progress + IJK Lift Installation & Commissioning done + External Final Coat Painting in Progress - Apr 2024

LMN – QA Certification in Progress 02/24 + External Texture Painting in Progress + Terrace & Common area Finishing in Progress - Apr 2024

RST – Structure works completed, External Plastering + Internal Putty + Tiling + Door & Window works in Progress - Apr 2024

RST - Structure works completed, External Plastering + Internal Tiling & Painting + Door & Window works in Progress - Apr 2024

UV – Structure works completed + Second Floor Masonry + First Floor Plastering works in Progress WX – Third Floor Structure works + First Floor Masonry in Progress - Apr 2024

IJK Cluster QA – 18/24 Common area Finishing in Progress - Feb 2024

External Development works in Progress - Feb 2024

LMN – QA in Progress @ L Cluster and External Painting in Progress @ MN Cluster and Final finishing works in Progress - Feb 2024

RST – Structure works completed, Internal Putty and Tiling in progress - Feb 2024

RST - Structure works completed, External Plastering + Internal Tiling & Painting + Door & Window works in Progress - Feb 2024

UV – Terrace floor Structure in Progress + 2nd floor Masonry in Progress WX – Second Floor Structure works in Progress - Feb 2024
Frequently Asked Questions
Pearl at Brigade Atmosphere is at Devanahalli, North Bengaluru and just 25 minutes from the International Airport.
Pearl at Brigade Atmosphere offers 3 BHK Villaments within an exclusive gated community.
Here’s a lowdown of the floor plans of residential units:
The 3 BHK Luxurious Courtyard Villaments has a
Super Built-Up Area :
235.96 - 240.52 Sq.m
(2540 - 2589 Sq. ft.)
Carpet Area :
168.84 Sq.m - 169.96 Sq.m
(1814 - 1830 Sq. ft.)
2 minutes from the Satellite Ring Road (STRR), Signature Club Resort (Brigade Orchards), Tamarind (Signature Club), The Arcade at Brigade Orchards, The Quad by Blr and Golfshire Club are some of the recreation options nearby. Devanahalli is easily accessible from other key areas of Bengaluru through a well-built road and rail network comprising NH-44 (Bellary Road), NH-648 and Devanahalli Railway Station. The region is also expected to benefit in the long term from the approved extension of upcoming Line 4 to Kempegowda International Airport, under Phase 2B of Namma Metro.
RERA NUMBER
PRM/KA/RERA/1250/303/PR/220207/004671
Looking for something specific?
We'd be delighted to help you.